Friday, June 25, 2010

Ready to pour the slab in main house

Kim and I met Wes at the house this morning and talked about a lot of things, with the most important being the selection of the metal roof color; a sort of slate/bronze.

The roof is important of course, but the big announcement is that the Porto-o-Jon arrives Monday.  Stay tuned to next Friday's post.  I can't wait!!!

We also took a few pictures of the main house foundation, which is now just about ready for the slab pour.  Next week, Lee and crew will stamp down the dirt a bit more, lay out the insulation that goes under the slab and pour.  The only open question is whether or not we should include the piping for radiant heat, and we're waiting to hear back on some bids to make that decision.

What a difference from a month ago, when I was standing among the rubble of the blasting. The foundation really looks great and Lee and his gang deserve a round of applause.


Friday, June 18, 2010

Foundation Walls


I went up to the site this morning to talk to Lee and look at our brand spanking new foundation.  In the pictures you'll see the footings and how the forms for the walls are placed.  The last few show the walls in place with the waterproofing on the outside.  

Next up is the slab and then onto the foundation for the barn.  I also met the contractors who will be doing the framing, and hoping that part is done by the end of July.














Friday, June 4, 2010

The footings are poured

Here are some shots Wes took of the footing put process.  We see the cement truck coming up the driveway and the way it pours into another truck that can reach the different parts of the foundation and inject the cement.

Below that are a few shots of the pour down in the foundation and one showing the end result.  Today, they will be stripping the forms and then starting to build the forms for the walls.







Tuesday, June 1, 2010

Footing Forms

Wes took a couple of pictures of the forms that are now in place for the footing pour tomorrow.  The house foundation is in three steps ... footings then walls then slab.  We're still thinking about radiant heat in the basement and need to decide before the slab work starts.


Saturday, May 29, 2010

Exiting our Quarry Period

Although we still only have a hole in the ground, we're about to move to the next stage. It's been a hard fought battle, but Lee from Rock On has now triumphed and the site is ready for the forms and then it's on to pouring the foundation.

Lee did some great work at the rear of the house and now has a good part of the grade merging in with the existing landscape. He also built up a small area that allowed us to stand and see the exact view we would have from our rear patio. For the first time, I can visualize the house on the site. When I told Kim that, my sensitive wife said that she has been able to do that 'for weeks'.

I think Wes is the most relived that we're moving past excavation, as our phone conversations started to feel more like therapy sessions as he ushered me through the process. I wonder if I can submit some bills to my HMO?

Yesterday we reviewed the site with Lee and Wes and also met with Bill Seguin, who has bid on the Geothermal HVAC system. We located the wells and talked about the possibility of using radiant heat in the basement and maybe a gas fired direct hot water heater.

Gary from GMPH & Sons, who will be our plumber also stopped by to coordinate schedules. He'll do some initial work during the foundation phase, but will then coordinate with the HVAC contractor once the house has a roof and walls.

During a lull in the conversation, we joked about the movie 'Mr. Blandings Builds His Dream House'. Turns out that the house that inspired the novel and movie is in New Milford, and still stands in the Merryall section of town.

Below are some shots of the site, cleaned up and ready for forms. The next post will have foundation shots.



Thursday, May 6, 2010

Rocks

There is now a very large piece of equipment on-site with only one purpose .... make many, many smaller rocks out of many large ones.






In order to make the site more manageable, Lee will be moving these smaller rocks down to areas that will eventually have retaining walls.

Saturday, May 1, 2010

Post Blast Clean-up

Kim and I stopped up at the site Friday afternoon between visiting the dentist and a session with Wes to discuss the various bids and some minor changes to the plans.  The first thing we noticed, and it was pretty hard to miss, was the driveway toward the top of the site was gone.  While we were blasting anyway, we decided to blast some of the ledge off of the driveway to lessen the slope.  Lee had already dragged out the blasted rock, so the only way up now was by foot.


Now that the blasting is done, Lee needs to spend some time doing what he calls 'organizing' the site.  I get what he means as right now there are piles of large rock all over the place.  First he's going to use a lot of the large excess pieces to fill in areas that need it and I guess then that will be covered with dirt.  Once that's done, they he can get back to digging out the foundation and sifting through the remaining rocks for us to use in fill and our various landscaping products.


Below are a couple of other shots ... basically the entire site curtain is now a quarry.