Saturday, May 29, 2010

Exiting our Quarry Period

Although we still only have a hole in the ground, we're about to move to the next stage. It's been a hard fought battle, but Lee from Rock On has now triumphed and the site is ready for the forms and then it's on to pouring the foundation.

Lee did some great work at the rear of the house and now has a good part of the grade merging in with the existing landscape. He also built up a small area that allowed us to stand and see the exact view we would have from our rear patio. For the first time, I can visualize the house on the site. When I told Kim that, my sensitive wife said that she has been able to do that 'for weeks'.

I think Wes is the most relived that we're moving past excavation, as our phone conversations started to feel more like therapy sessions as he ushered me through the process. I wonder if I can submit some bills to my HMO?

Yesterday we reviewed the site with Lee and Wes and also met with Bill Seguin, who has bid on the Geothermal HVAC system. We located the wells and talked about the possibility of using radiant heat in the basement and maybe a gas fired direct hot water heater.

Gary from GMPH & Sons, who will be our plumber also stopped by to coordinate schedules. He'll do some initial work during the foundation phase, but will then coordinate with the HVAC contractor once the house has a roof and walls.

During a lull in the conversation, we joked about the movie 'Mr. Blandings Builds His Dream House'. Turns out that the house that inspired the novel and movie is in New Milford, and still stands in the Merryall section of town.

Below are some shots of the site, cleaned up and ready for forms. The next post will have foundation shots.



Thursday, May 6, 2010

Rocks

There is now a very large piece of equipment on-site with only one purpose .... make many, many smaller rocks out of many large ones.






In order to make the site more manageable, Lee will be moving these smaller rocks down to areas that will eventually have retaining walls.

Saturday, May 1, 2010

Post Blast Clean-up

Kim and I stopped up at the site Friday afternoon between visiting the dentist and a session with Wes to discuss the various bids and some minor changes to the plans.  The first thing we noticed, and it was pretty hard to miss, was the driveway toward the top of the site was gone.  While we were blasting anyway, we decided to blast some of the ledge off of the driveway to lessen the slope.  Lee had already dragged out the blasted rock, so the only way up now was by foot.


Now that the blasting is done, Lee needs to spend some time doing what he calls 'organizing' the site.  I get what he means as right now there are piles of large rock all over the place.  First he's going to use a lot of the large excess pieces to fill in areas that need it and I guess then that will be covered with dirt.  Once that's done, they he can get back to digging out the foundation and sifting through the remaining rocks for us to use in fill and our various landscaping products.


Below are a couple of other shots ... basically the entire site curtain is now a quarry.





Wednesday, April 21, 2010

Blasting

Kim and I ventured up to see the site blasting this morning. It's a big job, and a company from Plantsville, CT, Blastech, Inc. is doing the work. First they drill holes.


Then then fill the holes with a combination of Trinitrotoluene (TNT) and Ammonium Nitrate and wire everything together. In this case, the equivalent of about 600 lbs of explosives.


For some reason, Brie seems to think she's going to be left up in the blast area. Smart dog, but it makes me think there is more to her past than I thought.


We took one more picture of of the ledge before it becomes a hole waiting for a basement.


Then they blast. You notice there is no picture or movie of the actual blasting. That's because Wes, Kim and I were talking down at the bottom of the drive-way, when all of the sudden a horn started going off signaling the blast was about to happen. I fumbled with my new iPod with the built in video camera for five seconds only to realize too late, that the little dickens was locked. At least we got to see the blast and come close to getting showered with rocks. Here are a few after shots.



They have two more blasts to do tomorrow. One for the Barn area and another to level an area on the driveway. With luck, Lee is back to work by the weekend and after digging the rock out, he can start the foundation next week.

Sunday, April 18, 2010

Kitchen Design Session II with Kelley

My sister Kelley joined me at Home Depot on Saturday to fine tune the kitchen and bath cabinet selections. Kelley was SO excited that we have added a garage to our kitchen! A garage? Yes, a nook with a sliding door to hide our coffee pots. I can hear them sliding in their parking spots now.

Kelley puts everything away in her tidy kitchen, well, not Mya, Greg and the dog.. but practically everything. I'm sure Kelley would like to garage, possibly even tow MANY things currently on our counters. My raisens and almonds still have a place on the counter, although I will clean up my act when I move to a new house :)

We think we got a good deal from Home Depot as they are running a sale thru May 2nd, where the more you spend the more you save. You should have seen the look on Wayne's face as he tried to understand that adding cabinets to the laundry room was going to ... 'save us money'. After a while I felt like Lucy talking to Ricky Ricardo. So basically we are getting the kitchen, laundry room and 2 large bathroom cabinets from Home Depot and chose the Decora brand which have solid wood doors and drawers. For the kitchen we would like the Harmony, Cherry wood, Brandywine stain (www.decoracabinets.com/).

We still have to pick out countertops, but we are pretty sure we want to go with a local cement craftman. Here is a photo of a possible kitchen cabinet handles, nothing earth shattering, but a break from more dirt photos at least. BUT...for those partial to dirt photos - stay tuned for 'blasted dirt' hopefully later this week.


Possible handles:

Saturday, April 10, 2010

More pictures of dirt

I met with Wes and Lee today at the site.  They have marked the three or four areas that need blasting and have one of the two estimates in.  If all goes well, the blasting should occur late this week or early next.  Either way, I'll be there to watch and perhaps push the button. 

We've decided to blast for a full basement, which is about 10 feet at the high point.  This will also give us material to use for retaining and stone walls.  While we're blasting, we'll also remove the 'hump' in the driveway we left last fall. 

I'm still not able to envision the house within the area cleared, but it looks like there will be some nice rock outcroppings near the house.  Below are some more pictures of the site.  The next post should include some pre and post blasting shots.







Thursday, April 8, 2010

More Site Clearing Pictures

The weather finally cleared and the ground dried last week, so Lee and company were back to clearing the land and cleaning over the ledge.  Below are some shots that Wes took.  The next step is to get a couple of companies in to give estimates on the blasting.

Alternatively, I was going to look up an old friend with military contacts and see if we could call in a 'Platoon' like air strike.  If I can't get a hold of him, I'm thinking of renting a U-Haul and heading to North Carolina to stock up on some fireworks and do the job myself.