Sunday, August 22, 2010

Getting close on the framing

You can now see that the roof sheathing on the North and South side is done.  The windows have arrived and are in the barn.  We're hoping that the framing is done and the windows are in by the end of the month.  This may not include the front porch.


Kim's walking through the great room and Brie is headed out the front door. You can see most of the Douglas Firs have been put in, so the framers can finish up the center section of the house now.

The picture to the right is from the North side of the house in the back looking up towards where the back patio will be.  Lee has built a retaining wall so we can have the slope in the back stop and create a flat area near the walk out part of the basement.

No comments:

Post a Comment