Lee has made a lot of progress on the Septic System. These pictures show the special Septic Sand is now in place. I'm not sure what is next, but we can see the top of the sand and since the top soil will be six inches above that, I can really see this blending in with the grade like I mentioned last week.
Rock On Excavation LLC, Bethlehem, 06751
14 years ago
No comments:
Post a Comment